Today marked the start of Stage 2 (b) namely, the builders cut a hole in the roof and started the construction of the dormer window. This will create a proper room in the loft area which is to be Iain's bedroom.


The pile of polystyrene on the drying green is going down steadily as the Polish lads place them bit by bit along the 4 sides of the house.

This shows the polystyrene sheets along the west and north sides. They are sitting on a metal mesh "ledge" which was secured in place and shown here as being propped up by wooden sticks. Ledges were placed in all the windows. They cover the old ledges.

Where the sheets had to be curved they have done it as shown here.
No comments:
Post a Comment