Monday 10 January 2011

HOUSE CONSTRUCTION: PHASE 2 BEGINS

Phase 2 has started: Davie arrived with his digger. Using the tractor from the farm he rolled up the street at first light and off-loaded the digger which is going to level the garage and clear a concreted area plus part of the garden in the back yard.

Toys for the boys; they just love driving this equipment!
.

The garage is being demolished and a new garage, wider and longer, is to be built in its place. It will be joined to the house by a connecting porch.


The garage is gone and excavation of the back lawn and garden area begins. This drying green is going to be halved and an sit-ootery (place to sit out) built in its place.

The recent snow is thawing so that means work can begin; the brick-layer and builders are scheduled. Hopefully all will continue ... until the next Big Freeze.